How Much Does EV Charger Installation Cost in the UK?

Short answer

A standard home 7kW smart EV charger installed in the UK costs £900–£1,400, including the charger, a dedicated circuit up to around 10 to 15 metres, protection, testing and certification. Solar-compatible chargers cost £1,100–£1,700 installed. Longer cable runs or trenching add £25–£80 per metre, workplace chargers cost £1,500–£3,500 per unit and relocating a charger costs £250–£600.

How Much Does EV Charger Installation Cost in the UK?

Typical EV charger installation prices in 2026

Most home installations fall into a fairly narrow band because the work is similar on most houses: a wall-mounted 7kW charger on the outside of the house or garage, a cable run from the consumer unit, suitable protection and testing. What moves the price is the charger model you choose, the length and difficulty of the cable route and whether your supply needs any upgrade.

The figures below are guide prices for common jobs. We give one fixed price once we have seen photos of your consumer unit, electricity meter, main fuse and the spot where you want the charger.

JobGuide priceWhat it usually covers
Standard home 7kW smart charger installed£900–£1,400Charger, circuit up to around 10–15 m, protection, testing, certification
Extra cable run or trenching£25–£80 per metreLonger routes, ducting under drives, trenching to garages
Solar-compatible home charger installed£1,100–£1,700Solar diversion mode and CT clamps configured
Workplace 7kW or 22kW charger£1,500–£3,500 per unitGroundwork and supply upgrades extra
Charger relocation or replacement£250–£600New charger extra
Fault-finding visitfrom £90Diagnosis only; repairs quoted separately

What is included in a standard installation

A standard home installation is designed to cover what most driveways need. The electrician fits the charger at a sensible height, runs a dedicated cable from the consumer unit or a separate small enclosure, installs a suitably rated circuit breaker and residual current protection, and connects the charger to your Wi-Fi or mobile data so its smart features work.

The circuit is then tested and certified under BS 7671. The installer registers the work through their competent person scheme or with building control, and notifies the network operator. You receive the electrical certificate and building regulations confirmation for your records, which are useful if you sell the house.

  • Charger unit, mounting and weatherproof connections
  • Dedicated circuit and protective devices
  • Earthing arrangement suitable for outdoor charging
  • App set-up and off-peak scheduling
  • Testing, certification and notification

Things that add to the cost

Distance is the most common extra. If the consumer unit is at the front of the house and the charger is on the front wall, the cable run is short. If the consumer unit is in a back kitchen and the car is parked at a detached garage, the cable may need to go through several rooms or be trenched across the garden, which adds labour and materials.

Supply capacity is the second. Older properties sometimes have a 60 amp main fuse, which leaves little headroom once a 32 amp charger is added to cooking, heating and showers. Load management with a CT clamp often solves this. In other cases, the network operator may need to upgrade the main fuse or service cable. Consumer units that are old, full or not suitable for extension may also need replacing.

Outbuildings bring their own questions. A detached garage with an existing sub-main may be able to supply a charger if the cable is large enough and the garage board has space, which can save a long new run. If the existing feed is undersized, a new cable is usually needed. The survey checks this rather than assuming either way.

  • Long cable runs or trenching across lawns and drives
  • Drilling through thick stone walls or solid floors
  • Consumer unit replacement or a separate enclosure
  • Earth rod installation where required
  • Supply or main fuse upgrade by the network operator

Choosing a charger affects the price

Home chargers range from simple units with app control to models with built-in load management, solar diversion and tariff integration. A tethered charger has a cable permanently attached, which is convenient. An untethered or socketed unit lets you plug in your own cable, which looks tidier and suits households with more than one car type.

Solar-compatible chargers cost a little more because they need extra clamps and set-up, but they can divert surplus solar generation into the car. Whichever model you choose, check it meets the Electric Vehicles (Smart Charge Points) Regulations 2021 and that the manufacturer is likely to support its app and software for years to come. Unsupported chargers are one of the main reasons people later pay for a replacement.

Workplace and commercial pricing

Workplace chargers are priced per unit, typically £1,500–£3,500 each, because commercial units are more robust and often include payment, access control or back-office software. Groundwork such as trenching across car parks, cutting tarmac, bollards and bay markings is quoted separately, as are upgrades to the building supply.

Larger sites usually need a load assessment. Several 22kW chargers running at once can exceed what the building supply can provide, so dynamic load management spreads power across vehicles. A survey identifies the supply capacity, cable routes and the best location for chargers before a fixed price is confirmed.

Getting an accurate fixed price

Photos make pricing much quicker. Take clear pictures of the consumer unit with the cover on, the electricity meter, the main fuse carrier if visible, and the wall where the charger will go. Measure, or estimate, the route from the consumer unit to that wall, noting any rooms, floors or outbuildings the cable must pass through.

With that information we confirm one all-in price covering the charger, materials, labour, testing, certification and notification. If a survey reveals a problem that changes the job, such as a supply that needs upgrading, we tell you before any work starts so there are no surprises on the day.

Questions people also ask

How long does a home EV charger installation take?

A standard home installation usually takes half a day to a day. Short cable runs on a modern consumer unit can be quicker. Long routes, trenching, an earth rod or a consumer unit replacement add time. The power is turned off for part of the work, so plan accordingly.

Do I need my main fuse upgraded for an EV charger?

Not always. Many homes have an 80 or 100 amp main fuse, which is usually enough with smart load management. Homes with a 60 amp fuse or heavy electrical demand may need an upgrade from the network operator. The installer checks your supply during the survey and advises.

Are there grants for home EV chargers?

Government support has changed several times and is now aimed mainly at specific groups, such as people living in flats or renting, and at workplaces. Schemes and eligibility change, so check the current position with the Office for Zero Emission Vehicles before relying on a grant when budgeting.